Infrastructure

REGENERATIVE MOTOR TORQUE TESTING (RMTT - 09)
  • 0 - 30 Nm Line 1 Dual (0-3 Nm)
  • 0 - 200 Nm Line 2 Dual (0-20 Nm)
HYDRAULIC AUTOMATIC
PUMP TESTING
  • 0 -10 M3/hr
  • 0 -30 M3/hr
  • 0 -50 M3/hr
  • 0 -200 M3/hr
  • 0 -500 M3/hr
NET POSITIVE SUCTION
HEAD FACILITY
COIL WINDING TESTING
  • Winding Resistance
  • AC / DC / IR / Ground Bond Test
  • Surge Testing
  • Rotation Analyzer
ELECTRICAL SAFETY ANALYZER TEST
  • Resistance Testing
  • AC / DC / IR / Ground Bond Test
  • Surge Testing
HERCULES 27 LEAK TESTING
  • Air Leak Testing
//